Under Construction

127 S 5th Ave

June 13, 2020

    Under Construction: Local developer Ross Rulney (5th Avenue Partners OF, LLC) is developing a 7-story multifamily residential building on an approximate 24,000 square foot lot at 127 S 5th Avenue. The new 90,000 square foot building will offer 96 market-rate studios and one-bedroom units. The plan includes on-site parking, bicycle parking and other […]


TCC Lot A Parking Garage

April 23, 2020

  Under Construction: Construction has begun on the new 300-space Lot A parking garage at the Tucson Convention Center. The new Lot A Garage will be adjacent to the 170-room DoubleTree Hotel that is currently under construction on the southeast side of the complex (northwest corner of Cushing Street and Church Avenue). It will serve […]


Historic Pima County Courthouse

February 26, 2020

  Under Construction: Pima County is continuing to renovate the historic former courthouse that will become a Southern Arizona tourism center in the heart of Downtown. The space will house a regional visitor center anchored by Visit Tucson, Pima County Attractions and Tourism and the UA Gem and Mineral Museum. The former courthouse is listed […]


Kasser Family Wing – Tucson Museum of Art

January 7, 2020

  Under Construction: In April of 2018, Tucson Museum of Art received a $2.5 million gift from trustee and Tucson business leader, I. Michael Kasser. The gift is the single most significant individual donor gift in the museum’s history. It is being used to construct a 6,000 square-foot gallery, to be named the Kasser Family Wing, and […]


Hilton at Cathedral Square

January 7, 2020

  Under Construction: Fayth Hospitality is developing a 199-room dual branded hotel, at 141 S. Stone Avenue, across the street from St. Augustine Cathedral. Hampton Inn and Home2 Suites, both Hilton brands, will occupy a new 6-story building along Stone Avenue. According to Rio Nuevo, the Hampton Inn will have 76 rooms while the extended […]


January 8th Memorial

January 4, 2020

  Under Construction: Chee Salette Architecture Office (CSAO) has revealed a final design for Tucson’s January 8th Memorial + Presidio Park master plan. The Arizona House of Representatives approved HB 2436 in 2017 which would appropriate a matching $2.5 million in state funds to the project which has already raised $2.5 million. The bill died in the […]


City Park

October 30, 2019

  Under Construction/Complete: City Park (20,40, 60 E Congress St), developed by Bourn Companies, is a transit oriented development located on Congress street just east of Stone Ave and a Sun Link modern streetcar stop. The first floor of the 5 story City Park building, at 40 E Congress, will house a food hall. The first […]


Union on 6th

July 23, 2019

  Under Construction: Greystar Real Estate Partners (acquired EdR), is the developer behind a transit-oriented and mixed-use complex at a prominent corner on Historic Fourth Avenue. Union on 6th will be a primarily residential complex consisting of 255 market rate apartments designed to attract young professionals and students that want access to the abundance of […]


DoubleTree by Hilton TCC Hotel

May 25, 2019

    Under Construction: On May 13th, Caliber –The Wealth Development Company (developer) and Ryan Companies (general contractor) broke ground on a $38 million, 170 room DoubleTree by Hilton hotel on the east side of the TCC on part of the current parking lot A. According to Caliber, the hotel will include four suites, one […]


The Monier

May 25, 2019

  Under Construction: Located in the Mercado District west of downtown, The Monier will be a four-story, 122 market-rate apartment project over 13,000 sqft ground-floor retail and office space, 148-space underground parking and other amenities for residents. Local developers Gadsden Company, held a ground breaking ceremony on November 15th. Monier will be adjacent to two other […]


Central Block Rehabilitation

February 27, 2019

  Under Construction: Developers Ron Schwabe and Marcel Dabdoub are partnering to remodel the buildings at 98 (former Wig-o-Rama), 100 (former Grill) and 110 (former Voodoo Jacks) East Congress Street into over 9,000 sqft of space for dining and retail. Each space will have the original brick facade rejuvenated close to its original splendor. Tucson’s […]


The Flin

February 25, 2019

  Under Construction: HSL Properties was approved for a GPLET in March and will spend an estimated $38.5 million for demolition of the existing structure and construction of a new one. Demolition of the 1973 property began in May of 2018, and will be replaced with a proposed 6-story residential building with 220,725 sqft. The […]


RendezVous Urban Flats

February 22, 2019

  Under Construction: RendeZvous Urban Flats will be a six story 121,000 sqft building with 104 market-rate apartments that are either one or two bedrooms ranging from 700-1,310 sqft and 4,200 sqft of ground floor retail. The project is also incorporating a ground-level plaza with amenities such as Ben’s Bells salvaged art, water features, barbecue […]


44 Broadway

May 8, 2018

  Under Construction/Proposed: At its April meeting, The Rio Nuevo Board authorized completion of a mixed-use project at 44 E Broadway. Developers, Ron Schwabe and Marcel Dabdoub, are renovating 26,120 sqft on the ground floor of the exisiting building for office and retail, to be completed late 2018. The project also includes construction of two […]